Abstract
This paper presents a multiagent system (MAS) day-ahead co-operation framework between renewable energy resources (RESs) and Battery Energy Storage Systems (BESSs) owned by different stakeholders. BESSs offer their storage services to RESs by shifting RES power to sell it during profitable peak-hours (aka; time-shifting). The MAS framework consists of three phases. Phase-one is a pre-auction phase that defines the maximum charging and discharging BESS power limits. These limits guarantee a reliable distribution system operation without violating the buses’ voltage limits or the ampacity of the branches. Phase-two is an auctioning phase between the BESS-agents and the RES-agents. Each agent has a different owner with a specific profit agenda and risk levels. The agent tries to maximize the profit potential of the owner. The agents use historical trade data and expected weather conditions to maximize profitability. Phase-three is called the post-auctioning phase, in which the agreement between the BESS- and RES-agents is finalized, and the agents are ready for another 3-phases trade. Case studies compare different auctioning strategies and prove the effectiveness of the proposed MAS system.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献