Abstract
Optimal scheduling of distributed energy resources (DERs) of a low-voltage utility-connected microgrid system is studied in this paper. DERs include both dispatchable fossil-fueled generators and non-dispatchable renewable energy resources. Various real constraints associated with adjustable loads, charging/discharging limitations of battery, and the start-up/shut-down time of the dispatchable DERs are considered during the scheduling process. Adjustable loads are assumed to the residential loads which either operates throughout the day or for a particular period during the day. The impact of these loads on the generation cost of the microgrid system is studied. A novel hybrid approach considers the grey wolf optimizer (GWO), sine cosine algorithm (SCA), and crow search algorithm (CSA) to minimize the overall generation cost of the microgrid system. It has been found that the generation costs rise 50% when the residential loads were included along with the fixed loads. Active participation of the utility incurred 9–17% savings in the system generation cost compared to the cases when the microgrid was operating in islanded mode. Finally, statistical analysis has been employed to validate the proposed hybrid Modified Grey Wolf Optimization-Sine Cosine Algorithm-Crow Search Algorithm (MGWOSCACSA) over other algorithms used.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
40 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献