Abstract
The management of the life cycle of large publicly owned social housing complexes requires a large amount of human and technological resources, the optimization of which is a desirable and shared objective. This article proposes a workflow for the enhancement of these management processes based on BIM (Building Information Modelling), a methodology capable of integrating architectural information into a three-dimensional graphic model. The proposed workflow defines the basic characteristics of the BIM model oriented toward sustainable building management and its relationship with the key moments of its life cycle. It also analyzes the architectural information associated with the models and determines which parameters are optimal for their completion from the BIM models in terms of reliability, auditability, and automation. For this purpose, a case study has been developed for a multifamily residential building in Malaga (Spain), owned by the Andalusian Housing and Rehabilitation Agency AVRA, a public agency that manages a housing stock of more than 70,000 dwellings.
Funder
European Regional Development Funds
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献