Probabilistic Decline Curve Analysis: State-of-the-Art Review

Author:

Yehia Taha1ORCID,Naguib Ahmed1,Abdelhafiz Mostafa M.1ORCID,Hegazy Gehad M.2,Mahmoud Omar1ORCID

Affiliation:

1. Department of Petroleum Engineering, Faculty of Engineering and Technology, Future University in Egypt (FUE), Cairo 11835, Egypt

2. Department of Petroleum Engineering, Faculty of Engineering, American University in Cairo (AUC), AUC Avenue, Cairo 11835, Egypt

Abstract

The decline curve analysis (DCA) technique is the simplest, fastest, least computationally demanding, and least data-required reservoir forecasting method. Assuming that the decline rate of the initial production data will continue in the future, the estimated ultimate recovery (EUR) can be determined at the end of the well/reservoir lifetime based on the declining mode. Many empirical DCA models have been developed to match different types of reservoirs as the decline rate varies from one well/reservoir to another. In addition to the uncertainties related to each DCA model’s performance, structure, and reliability, any of them can be used to estimate one deterministic value of the EUR, which, therefore, might be misleading with a bias of over- and/or under-estimation. To reduce the uncertainties related to the DCA, the EUR could be assumed to be within a certain range, with different levels of confidence. Probabilistic decline curve analysis (pDCA) is the method used to generate these confidence intervals (CIs), and many pDCA approaches have been introduced to reduce the uncertainties that come with the deterministic DCA. The selected probabilistic type of analysis (i.e., frequentist or Bayesian), the used DCA model(s), the type and the number of wells, the sampling technique of the data or the model’s parameters, and the parameters themselves undergo a probability distribution, and these are the main differences among all of these approaches and the factors that determine how each approach can quantify the uncertainties and mitigate them. In this work, the Bayesian and frequentist approaches are deeply discussed. In addition, the uncertainties of DCA are briefly discussed. Further, the bases of the different probabilistic analyses are explained. After that, 15 pDCA approaches are reviewed and summarized, and the differences among them are stated. The study concludes that Bayesian analysis is generally more effective than frequentist analysis, though with narrower CIs. However, the choice of DCA model and sampling algorithm can also affect the bounds of the CIs and the calculation of the EUR. Moreover, the pDCA approach is recommended for quantifying uncertainties in DCA, with narrower CIs that indicate greater effectiveness. However, the computational time and the number of iterations in sampling are also considered critical factors. That is why various assumptions and modifications have been made in the pDCA approaches, including the assumption of a certain probability distribution for the sampled parameters to improve their reliability of reserve estimation. The motivation behind this research was to present a full state-of-the-art review of the pDCA and the latest developments in this area of research.

Publisher

MDPI AG

Subject

Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous),Building and Construction

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3