Deformation and Stress Law of Surrounding Rock for a Bifurcated Tunnel with a Super-Large Section: A Case Study

Author:

Wu Xiaodong1ORCID,Li Yu1,Gong Min1,Wu Haojun1,Wu Yifan1

Affiliation:

1. Department of Safety Science and Engineering, School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing 100083, China

Abstract

The construction method of transitioning from a small cross-section to excavating a super-large cross-section tunnel plays a crucial role in the quality of the final super-large cross-section tunnel and the safety of the tunnel structures and workers during the construction process. The Shenzhen Liantang Bifurcated Tunnel, with a maximum cross-sectional area of 428.4 m2, was the largest cross-sectional tunnel constructed in China in 2018, and there are few engineering projects that can serve as references. To enhance construction safety and achieve the transformation from a two-lane tunnel to a five-lane tunnel, this paper proposes two tunneling methods, namely, the reverse top-heading method and the advance climbing method. Moreover, numerical simulation using MIDAS GTS/NX software was adapted to compare and analyze the stress and deformation characteristics of the surrounding rock in the construction stages using the two methods. The simulation shows that the advance climbing method is more suitable for the construction of the Liantang tunnel. Through on-site monitoring and measurement, the data of peripheral rock vault subsidence, peripheral convergence, and pressure of the supporting structure were assessed. The results show that the maximum values of peripheral rock vault subsidence and peripheral convergence displacement are located in the permissible range of road tunnel vault subsidence. This further verifies the reasonableness of the advance climbing method. This paper not only provide a basis for the construction of the Liantang tunnel but also serves as a reference for construction methods and typical cases for similar super-large-section tunnel projects.

Funder

National Natural Science Foundation of China

China Postdoctoral Science Foundation

Publisher

MDPI AG

Subject

Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science

Reference29 articles.

1. Construction technology of super-large section of highway tunnels with four or more lanes in China;Zhang;China J. Highw. Transp.,2020

2. Development trends and views of highway tunnels in China over the past decade;Hong;China J. Highw. Transp.,2020

3. Grouting effects evaluation of water-rich faults and its engineering application in Qingdao Jiaozhou Bay Subsea Tunnel, China;Zhang;Geomech. Eng.,2017

4. Study on construction method optimization and construction mechanical characteristics of a single-span five-lane highway tunnel;Zhang;Tunn. Constr.,2021

5. Stability analysis of bifurcated highway tunnels with large section in tiger leaping gorge;Zhang;Highway,2021

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3