Abstract
The presented article deals with the issue of solving bottlenecks in the logistics flow of a manufacturing company. The Tx Plant Simulation software tool is used to detect bottlenecks and deficiencies in the company’s production, logistics and transportation systems. Together with the use of simulation methods and lean manufacturing tools, losses in business processes are eliminated and consequently flow throughput is improved. In the TX Plant Simulation software environment, using Bottleneck analyzer, bottlenecks were defined on the created simulation model and a method of optimizing logistics flows was designed and tested by introducing the Kanban pull system. This resulted in an improvement and throughput of the entire logistics flow, a reduction in inter-operational stocks and an increase in the efficiency of the production system as a whole.
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development
Cited by
25 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献