Abstract
The precast concrete structure has the advantage of a short construction period, less labor consumption, and less pollution. The lapped-rebar splice is a type of connection for assembled reinforced concrete shear walls in the precast concrete structure. In this study, the anchoring performance of a short-lapped-rebar splice with a corrugated metal duct and spiral hoops is investigated. A total of 30 specimens were designed considering the influences of the rebar diameter and the lapped length, and the tension testing of the splice was carried out. The results show that the specimens with 0.15 times the suggested length in GB 50010-2010 fail by the fracture of rebar, while the specimens with 0.1 times and 0.05 times the suggested length show the pull-out failure of rebar. The ultimate bond strength of specimens with the suggested length is higher than that of the conventional specimens. The stress of the anchored rebar in the short-lapped-rebar splices is distributed symmetrically along the longitudinal direction. The maximum bond stress of the anchored rebar reaches 35 MPa, which is approximately 1.4 times that in the conventional specimens. A semi-empirical model for predicting the ultimate bond strength of the short-lapped-rebar splice is proposed, and it shows good agreement with tested values; the average error estimated from the proposed model is only 4.49%.
Funder
Anhui University of Technology Foundation
National Natural Science Foundation of China
Subject
General Materials Science,Metals and Alloys
Reference30 articles.
1. State-of-the-art review and design of grouted duct connections for precast bridge columns;Tazarv;Structures,2021
2. Seismic performance of precast shear walls prestressed via post-tensioned high strength bars placed inside grouted corrugated pipes;Zhi;Eng. Struct.,2021
3. Bond-Slip Response of Reinforcing Bars Grouted in Ducts;Raynor;ACI Struct. J.,2002
4. Development of a precast concrete bent-cap system;Matsumoto;PCI J.,2008
5. Brenes, F.J. (2005). Anchorage of Grouted Vertical Duct Connections for Precast Bent Caps. [Ph.D Thesis, University of Texas].
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献