Abstract
The purpose of this paper is to investigate the nature of public opposition (PO) to the siting of construction and demolition (C&D) waste management facilities in Australia. A qualitative case study of PO to the development proposal for the Gunnedah waste facility, in the state of New South Wales (NSW), was conducted. The waste facility is promised to process up to 250 kilotons of waste materials, much of which is C&D waste intended for use in road constructions after processing. Using a content analysis approach, the study analysed 86 public submissions that were lodged within the allocated development application exhibition period to systematically analyse the arguments used by the submitters about the establishment of the facility. The case study revealed five broad perceived risk classes to the siting of the Gunnedah waste facility, namely location, environmental, human health, financial and process risks. It was also shown that while not-in-my-back-yard (NIMBY) attitudes may have played a part in the PO to the sitting at the facility, the PO was heavily affected by the poor public participation process. The study outlines key strategies for an effective public participation process that may assist with the management of PO to the siting of C&D waste management facilities in Australia. The study contributes to the theory and practice of effective C&D waste management, enhancing the social acceptance of such facilities toward a more circular economy in the built environment.
Subject
Management, Monitoring, Policy and Law,Waste Management and Disposal,General Materials Science
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献