Cost Forecasting Model of Transformer Substation Projects Based on Data Inconsistency Rate and Modified Deep Convolutional Neural Network
Author:
Wang Hongwei,Huang Yuansheng,Gao Chong,Jiang Yuqing
Abstract
Precise and steady substation project cost forecasting is of great significance to guarantee the economic construction and valid administration of electric power engineering. This paper develops a novel hybrid approach for cost forecasting based on a data inconsistency rate (DIR), a modified fruit fly optimization algorithm (MFOA) and a deep convolutional neural network (DCNN). Firstly, the DIR integrated with the MFOA is adopted for input feature selection. Simultaneously, the MFOA is utilized to realize parameter optimization in the DCNN. The effectiveness of the MFOA–DIR–DCNN has been validated by a case study that selects 128 substation projects in different regions for training and testing. The modeling results demonstrate that this established approach is better than the contrast methods with regard to forecasting accuracy and robustness. Thus, the developed technique is feasible for the cost prediction of substation projects in various voltage levels.
Funder
Fundamental Research Funds for the Central Universities
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Reference47 articles.
1. A PMU Placement Scheme Considering Realistic Costs and Modern Trends in Relaying
2. A Probabilistic Cost/Benefit Analysis of Transmission and Distribution Asset Expansion Projects
3. Research on Prediction of Architectural Engineering Cost based on the Time Series Method;Hu;J. Taiyuan Univ. Technol.,2012
4. A Model of Building Project Cost Estimation Based on Multiple Structur Integral Linear Regression;Wei;Archit. Technol.,2015
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献