A Chance Constrained Programming Approach for No-Wait Flow Shop Scheduling Problem under the Interval-Valued Fuzzy Processing Time

Author:

Sun HaoORCID,Jiang Aipeng,Ge Dongming,Zheng Xiaoqing,Gao FarongORCID

Abstract

This work focuses on the study of robust no-wait flow shop scheduling problem (R-NWFSP) under the interval-valued fuzzy processing time, which aims to minimize the makespan within an upper bound on total completion time. As the uncertainty of actual job processing times may cause significant differences in processing costs, a R-NWFSP model whose objective function involves interval-valued fuzzy sets (IVFSs) is proposed, and an improved SAA is designed for its efficient solution. Firstly, based on the credibility measure, chance constrained programming (CCP) is utilized to make the deterministic transformation of constraints. The uncertain NWFSP is transformed into an equivalent deterministic linear programming model. Then, in order to tackle the deterministic model efficiently, a simulated annealing algorithm (SAA) is specially designed. A powerful neighborhood search method and new acceptance criterion are applied to find better solutions. Numerical computations demonstrate the high efficiency of the SAA. In addition, a sensitivity analysis convincingly shows that the applicability of the proposed model and its solution strategy under interval-valued fuzzy sets.

Funder

National Natural Science Foundation of China

Publisher

MDPI AG

Subject

Process Chemistry and Technology,Chemical Engineering (miscellaneous),Bioengineering

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3