HVAC Operation Schemes and Commissioning Process Resolving Stack Effect Problem and Adjusting According to Changes in the Environment: A Case Study in High-Rise Building in South Korea

Author:

Yu Jungyeon,Kim AngieORCID,Bae Sanghwan,Cho Dongwoo,Kim Kee Han

Abstract

Various problems often arise in high-rise buildings during the winter months due to the stack effect. In this study, the high-rise building of interest, located in South Korea, was experiencing constant loud noises in the winter due to the stack effect. Thus, we created a noise level reduction plan by creating a method for pressurizing the high-rise zones of the building according to outdoor conditions. To discover the appropriate pressurization operating modes, we applied a two-year commissioning process to the 50-story building of interest. The 1st- and 47th-floor elevator halls were identified to have the highest noise levels of all other floors. Prior to applying the reduction plan, the maximum noise level on the first floor with the HVAC system turned off was 85 dB(A) and with the HVAC system turned on it was 70 dB(A). Both values exceeded the criteria of 57 dB(A) for a lobby space of a commercial building. In the case of the 47th floor, the maximum noise level with the HVAC system turned off was 58.7 dB(A) and with the HVAC system turned off was 56.0 dB(A), despite the latter having increased airtightness performance and applying preliminary pressurization (i.e., HVAC operation mode 2). These values exceeded the criteria of 48 dB(A) for an elevator hall in a commercial building. Following this initial data, we determined to pressurize the high/mid-rise zones of the building according to the outdoor air temperature and wind velocity conditions, which we categorized into four types (i.e., HVAC operation mode 4). To this effect, the first-floor elevator hall’s maximum noise level was 56.6 dB(A), meeting the criteria, and the 47th-floor elevator hall’s maximum noise level was 49.5 dB(A), still exceeding the criteria but by an insignificant amount. Although the HVAC pressurization operation we utilized resulted in favorable results for the target building A, it may not be as effective in other new high-rise buildings, creating changes to the indoor air environment or to the energy costs in maintaining a building. However, for the purposes of resolving the stack effect, we believe that the commissioning process we took to optimize the HVAC operation that is presented here can be applied to other new and existing high-rise commercial buildings.

Publisher

MDPI AG

Subject

Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)

Reference28 articles.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3