Author:
Huang Jia-Yue,Cao Yun-Fei,Zhou Hui-Ling,Cao Hong,Tang Bao-Jun,Wang Nan
Abstract
This article presents a real option model for helping investors to determine the optimal investment timing and scale of overseas oil projects. The model is suitable for the highly uncertain environments in which many oil companies operate, where they have to suspend upstream investment, stop new oilfield construction, and wait for proper oil prices in order to avoid losses. Considering the uncertainty of oil prices and exchange rates, the results of analytical solutions presented in this paper show the critical oil price that can be seen as the investment threshold for triggering oilfield development as well as the optimal recoverable factor for every oil price level to indicate the optimal investment scale. Results of the case project show the critical oil price, which is 82.32 US dollar per barrel, and the selection of optimal investment scale. The article also demonstrates the impact of investment scale on investment timing in overseas oil projects. The policy implication from the case project is that investment decisions are finitely impacted by geological conditions. Besides, the existence of tax holiday directly contributes to a lower investment threshold. In addition, reducing unit operation cost can obviously enlarge optimal investment scale and initiate oil projects in a relatively low level of investment threshold.
Funder
National Natural Science Foundation of China
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Reference70 articles.
1. Sustained Low Oil Prices Could Reduce Exploration and Production Investmenthttps://www.eia.gov/todayinenergy/detail.php?id=23072#
2. Mining and Exploration Investment Declined 35% in 2015https://www.eia.gov/todayinenergy/detail.php?id=24912
3. China’s overseas oil and gas investment: Motivations, strategies, and global impact;Wu;Oil Gas Energy Law Intell.,2008
4. A study on overseas oil and gas investment to avoid the risk of the changes in tax policies: A case in China
5. A dynamic model for valuing flexible mining exploration projects under uncertainty
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献