Abstract
The study examines the development and testing of algorithms for disturbance inception time estimation in a power system using instantaneous values of current and voltage with a high sampling rate. The algorithms were tested on both modeled and physical data. The error of signal extremum forecast, the error of signal form forecast, and the signal value at the so-called joint point provided the basis for the suggested algorithms. The method of tuning for each algorithm was described. The time delay and accuracy of the algorithms were evaluated with varying tuning parameters. The algorithms were tested on the two-machine model of a power system in Matlab/Simulink. Signals from emergency event recorders installed on real power facilities were used in testing procedures. The results of this study indicated a possible and promising application of the suggested methods in the emergency control of power systems.
Subject
General Mathematics,Engineering (miscellaneous),Computer Science (miscellaneous)
Cited by
16 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献