Author:
Wei Hongjun,Yuan Jinjiang,Gao Yuan
Abstract
We consider the coordination of transportation and batching scheduling with one single vehicle for minimizing total weighted completion time. The computational complexity of the problem with batch capacity of at least 2 was posed as open in the literature. For this problem, we show the unary NP-hardness for every batch capacity at least 3 and present a polynomial-time 3-approximation algorithm when the batch capacity is at least 2.
Funder
National Natural Science Foundation of China
Subject
General Mathematics,Engineering (miscellaneous),Computer Science (miscellaneous)
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献