Abstract
Curtailment losses for large-scale hybrid wind–solar photovoltaic (PV) plants with a single grid connection point are often calculated in 1 h time resolution, underestimating the actual curtailment losses due to the flattening of power peaks occurring in shorter time frames. This paper analyses the curtailment losses in hybrid wind–PV plants by utilising different time resolutions of wind and PV production while varying the grid cut-off power, wind/solar PV farm sizes, and shares of wind/PV capacity. Highly resolved 1 s measurements from the operational wind farm and pyranometer are used as an input to specialized wind and PV farm power production models that consider the smoothing effect. The results show that 15 min resolution is preferred over 1 h resolution for large-scale hybrid wind–PV plants if more accurate assessment of curtailment losses is required. Although 1 min resolution additionally increases the estimation accuracy over 15 min resolution, the improvement is not significant for wind and PV plants with capacity above approx. 10 MW/10 MWp. The resolutions shorter than 1 min do not additionally increase the estimation accuracy for large-scale wind and PV plants. More attention is required when estimating curtailment losses in wind/PV plants with capacity below approx. 10 MW/10 MWp, where higher underestimation can be expected if lower time resolutions are used.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous),Building and Construction
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献