Author:
Panoiu Caius,Ciulica Dumitru,Panoiu Manuela,Mezinescu Sergiu
Abstract
This paper addresses one of the current areas of interest in electrical engineering, which is controlled switching of high voltage circuit breakers. During their operation, the problem of controlled switching of high voltage circuit breakers in commutation regimes was studied. Several types of switching were analyzed, considered representative of the transient regime, depending on the type of load, on the defect that may occur on the power supply lines, as well as depending on the position of this defect (near or far). The study carried out in the paper includes simulations of the controlled connection/disconnection operations in a transient regime, assuming the existence of different kinds of defects. To perform the study and simulations in the transient regime, a model, implemented in Matlab, was used for a time interval located around the origin of the time axis. The study included the dependence of the SF6 circuit breaker switching process on the following parameters: the DC voltage supply, ambient temperature and oil pressure in the circuit breaker actuator. The validity of the theory presented in this paper, in addition to being validated by simulations, is proven by the fact that the protection system currently in use at the power station of an 800 MW power plant, at the 400 kV power line, is based on the principles presented in this paper. The theory presented in the paper has been implemented in industry for nearly two years, and the results confirm that the theory presented in the paper is fully applicable in high voltage power stations.
Subject
Electrical and Electronic Engineering,Industrial and Manufacturing Engineering,Control and Optimization,Mechanical Engineering,Computer Science (miscellaneous),Control and Systems Engineering
Reference42 articles.
1. Controlled Switching of HVAC Circuit Breakers: Application Examples and Benefits
2. Controlled Switching of HVAC Circuit Breakers, Guide for Application Lines, Reactors, Capacitors, Transformers (1st part). Group, CIGRÉ Working. Paris, CIGRÉ Working Group 13.07, 1999. Electra No 183https://e-cigre.org/publication/ELT_183_2-controlled-switching-of-hvac-circuit-breakers-guide-for-application-lines-reactors-capacitors-transformers-ist-part
3. Controlled Switching of HVAC Circuit Breakers, Guide for Application Lines, Reactors, Capacitors, Transformers (2nd part). Group, CIGRÉ Working. Paris, s.n., 1999 august. Electra No 185 part2https://e-cigre.org/publication/ELT_185_2-controlled-switching-of-hvac-c-ircuit-breakers-guide-for-application-lines---reactors---capacitors---transformers-2nd-part
4. Novel method for restraining 35 kV shunt reactor switching overvoltage – phase controlled breaker