Abstract
For several decades, the number of reported accidents and fatal incidents in the construction industry has remained high compared to those in other industries. Therefore, many studies have been conducted in an effort to reduce accidents and fatal incidents in the construction industry. Recently, construction safety management has shifted from the construction phase to the pre-construction phase, ultimately to eliminate fatal incidents. In line with this change, South Korea enacted the Design for Safety (DfS) process in 2016. However, the current DfS process remains not well implemented for several reasons. Therefore, this study aims to present eight alternatives to improve the DfS process and suggests DfS improvement priorities by considering construction project participants and career levels using what is known as a fuzzy-analytical hierarchy process (F-AHP) analysis. The results of this study are as follows. First, respondents overall suggested improvements in the area of ‘assignment of responsibility for DfS to the client’ (0.196). Second, improvement priorities were also identified according to construction project participants and career levels. The results of the study can be utilized as basic information for DfS improvements during construction projects.
Funder
National Research Foundation of Korea
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献