Scheduling the Process of Robot Welding of Thin-Walled Steel Sheet Structures under Constraint

Author:

Sobaszek ŁukaszORCID,Świć AntoniORCID

Abstract

Industrial robot work optimization has been extensively studied. The main reason for analysis is the growing number of robots implemented in the different manufacturing processes. In order to benefit from the implementation of industrial robots, each implementation process ought to be preceded by an in-depth analysis of the stand work. Often the integrator’s intuition is the only base for decisions. This work focuses on the need for individualized scheduling and analysis of robotic production tasks in the context of overall production scheduling. The method of alternative schedules analysis was presented. The paper presents a scheduling process for an industrial robot in the process of robot welding of thin-walled steel sheet structures under constraints caused by the process technology. The proposed method allowed to reduce the assumed time criterion at the level of 5.4% for one detail. The obtained value of technological operation time reduction resulted in increased time savings throughout the entire production process.

Publisher

MDPI AG

Subject

Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3