Abstract
Central to the design of a direct current fast charging (DCFC) network is the question of how much energy a DCFC of a given power can supply to vehicles without users being forced to queue to charge. We define ‘utilization factor’ as the ratio of the energy delivered by a DCFC in a multi-day period to the maximum amount of energy it could deliver in period. Three and a half years of data from 12 DCFCs are examined, characterizing each charging event by both the utilization factor and the time lag since the termination of the previous charging event. Short lags between events are inferred to indicate queuing. To keep the fraction of would-be users who have to queue below 10%, the overall utilization of the DCFC must likewise be limited to 10% (or 7–17% in exceptionally heterogeneous or exceptionally homogeneous traffic patterns, respectively). E.g., a 100 kW DCFC should not be expected to deliver more than 240 kWh per day (100 kW × 24 h × 10%).
Funder
Nova Scotia Department of Energy
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献