Abstract
Industrial parks have various sources and conversion forms of energy. The many uncertainties in the planning of industrial park integrated energy systems (IPIES) pose a great risk of regret in planning schemes; thus, an expansion planning method for an IPIES, considering regret aversion, is proposed. Based on comprehensive regret value consisting of min–max regret aversion and the min average regret value, the method optimizes the comprehensive cost of the expansion planning scheme in IPIES under different natural gas price fluctuation scenarios, including costs of construction, operation and maintenance, and environmental protection. A multi-stage expansion planning scheme and typical daily operation plans under multiple natural gas price fluctuation scenarios of the IPIES in an economic and technological development zone in southeast China are used to demonstrate the validity of the method. The results show that, compared with a traditional planning method based on expectation, the proposed expansion planning method could reduce the maximum regret value by 14% on average, and greatly reduces the risk of decision-making regret by up to 18%. At the same time, the influence of natural gas price on expansion planning of the IPIES is discussed.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献