Affiliation:
1. School of Computer Science, Nanjing University of Posts and Telecommunications, Nanjing 210023, China
Abstract
The challenge of distributing molten iron involves the optimal allocation of blast furnace output to various steelmaking furnaces, considering the blast furnace’s production capacity and the steelmaking converter’s consumption capacity. The primary objective is to prioritize the distribution from the blast furnace to achieve a balance between iron and steel production while ensuring that the volume of hot metal within the system remains within a safe range. To address this, a constrained multi-objective nonlinear programming model is abstracted. A linear weighting method combines multiple objectives into a single objective function, while the Lagrange multiplier method addresses constraints. The proposed hybrid Archimedes optimization algorithm effectively solves this problem, demonstrating significant improvements in time efficiency and precision compared to existing methods.
Funder
Scientific Technology Projects of Jiangsu Jinheng Information Technology Co., Ltd.
Reference22 articles.
1. A review of dynamic scheduling in iron and steel production process;Zhao;Metall. Ind. Autom.,2022
2. An improved imperialist competitive algorithm for hybrid flowshop rescheduling in steelmaking-refining-continuous casting process;Peng;Meas. Control.,2020
3. Yu, Y., Pan, Q.K., Pang, X.F., and Tang, X.C. (2024). An Attribution Feature-Based Memetic Algorithm for Hybrid Flowshop Scheduling Problem with Operation Skipping. IEEE Trans. Autom. Sci. Eng., Early Access.
4. A robust dynamic scheduling approach based on release time series forecasting for the steelmaking-continuous casting production;Long;Appl. Soft Comput.,2020
5. Comparison of lot streaming division methodologies for multi-objective hybrid flowshop scheduling problem by considering limited waiting time;Yeni;JIMO,2024