Abstract
Reducing the duration of construction works requires additional organizational measures, such as selecting construction methods that assure a shorter realization time, engaging additional resources, working overtime, or allowing construction works to be performed simultaneously in the same working units. The simultaneous work of crews may affect the quality of works and the efficiency of construction processes. This article presents a simulation model aimed at assessing the impact of the overlap period on the extension of the working time of the crews and the reduction of a repetitive project’s duration in random conditions. The purpose of simulation studies is to provide construction managers with guidelines when deciding on the dates of starting the sequential technological process lines realized by specialized working crews, for sustainable scheduling and organization of construction projects.
Funder
Ministerstwo Nauki i Szkolnictwa Wyższego
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development
Reference48 articles.
1. A Guide to the Project Management Body of Knowledge,2000
2. Project Scheduling: A Research Handbook;Demeulemeester,2002
3. Network Scheduling Techniques for Construction Project Management;Hajdu,1997
4. New Approach to Improve General Contractor Crew’s Work Continuity in Repetitive Construction Projects
5. Workspace planning in construction: non-deterministic factors
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献