Abstract
This paper reviews the Acid Mine Drainage (AMD) remediation potential and operational costs of twelve existing AMD remediation methods against Class 0 and Class I AMD geochemical characteristics as defined in the Modified Hill Framework. Of the twelve remediation options reviewed in this study, eleven required additional process steps either for further treatment to achieve the discharge limits or for the safe management of hazardous waste by-products. Chemical desalination showed the greatest potential with high quality treated water and operational costs between USD 0.25 and USD 0.75 per cubic meter treated. The management of the toxic metal and sulphide by-products remains a key challenge that requires further research for sustainable mine water remediation. Further development of end-to-end methods suitable for Class 0 AMD with economical operational costs is recommended in order to effectively address the ongoing environmental challenges posed by AMD globally.
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献