1. Techincally Economical Analysis of Low Temperature Economizer Project of 1000 MW Unit;Xu;J. Shanghai Univ. Electr. Power,2014
2. Performance analysis of anti-corrosion heat exchangers made of special plastics for flue gas heat recovery;Chen;Proc. Chin. Soc. Electr. Eng.,2014
3. Application of the WGGH in 1000MW Unit;Wang;Power Syst. Eng.,2017