Author:
Lee Sangdeok,Cha Yongwoon,Han Sangwon,Hyun Changtaek
Abstract
A construction defect can cause schedule delay, cost overrun and quality deterioration. In order to minimize these negative impacts of construction defects, this paper aims to analyze the causality of construction defects. Specifically, association rule mining (ARM) is used to quantify the interrelationships between defect causes, and social network analysis (SNA) is utilized to find out the most influential causes triggering generation of construction defects. The suggested approach was applied to 2949 defect instances in finishing work. Through this application, it was confirmed that the proposed approach can systematically identify and quantify causality among defect causes.
Funder
National Research Foundation of Korea
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development
Cited by
27 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献