Deformation Pattern and Failure Mechanism of Railway Embankment Caused by Lake Water Fluctuation Using Earth Observation and On-Site Monitoring Techniques

Author:

Li Shengxiang12,Li Yongwei12,Xu Linrong12

Affiliation:

1. School of Civil Engineering, Central South University, 68 Shaoshan Road, Changsha 410075, China

2. National Engineering Research Center of High-Speed Railway Construction Technology, Central South University, Changsha 410075, China

Abstract

The prediction of railway embankment failure is still a global challenge for the railway industry due to the complexity of embankment failure mechanisms. In this work, the pre-failure deformation and the settlement from abnormal deformation to the final failure were investigated based on earth observation and on-site monitoring with a focus on the deformation stage and failure mechanism of railway embankments. Some new viewpoints are suggested: (1) the differential settlement of ~19 mm revealed via InSAR at the failure region of the embankment may have been caused by internal erosion after rapid drawdown. The cumulative settlement was found to increase with the decline of the lake water level. (2) The railway embankment experienced three phases of primary, secondary, and accelerated creep phases, similar to the evolution of most landslide or dam failures. However, the train loading and seepage force may have aggravated the secondary consolidation, promoting the embankment to enter the accelerated creep phase quickly. The deformation pattern was presented as an exponential curve trend. (3) The formation mechanism of embankment collapse can be summarized as “seepage failure-creep-shear slip-collapse” failure under repeated train loading and rapid drawdown. This work provides some clues for early warnings and for the development of maintenance plans.

Funder

the National Natural Science Foundation of China

Fundamental Research Funds for the Central Universities of Central South University

Publisher

MDPI AG

Subject

Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry

Reference45 articles.

1. Section Design and Seep Proof Design for Subgrade in Reservoir Area;He;Subgrade Eng.,2006

2. Transportation Safety Board Canada (TSBC) (2019). Rail Transportation, Transportation Safety Board Canada (TSBC).

3. Canelles landslide: Modelling rapid drawdown and fast potential sliding;Pinyol;Landslides,2012

4. Zhang, Y., Zhang, Z., Xue, S., Wang, R., and Xiao, M. (2020). Stability analysis of a typical landslide mass in the Three Gorges Reservoir under varying reservoir water levels. Environ. Earth Sci., 79.

5. Some new pre-warning criteria for creep slope failure;Xu;Sci. China Technol. Sci.,2011

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3