Failure Prevention in Large-Diameter Water Pipelines Using Reliability-Centered Maintenance

Author:

Geisbush James1ORCID,Ariaratnam Samuel T.2

Affiliation:

1. Central Arizona Project, P.O. Box 43020, Phoenix, AZ 85080-3020, USA

2. School of Sustainable Engineering & The Built Environment, 660 S. College Ave., Arizona State University, P.O. Box 873005, Tempe, AZ 85287-3005, USA

Abstract

The consequences of failures from large-diameter water pipelines can be severe. Results can include significant property damage, adjacent damage to infrastructure such as roads and bridges resulting in transportation delays or shutdowns, adjacent structural damage to buildings resulting in loss of business, service disruption to a significant number of customers, loss of water, costly emergency repairs, and even loss of life. The Washington Suburban Sanitary Commission (WSSC) in the United States found that flooding was the greatest concern due to its potential duration, the potential for broad geographic impact, and its role in crater creation. Public safety, property damage, social and economic consequences, and loss of water service and for how long is also of paramount concern. The American Water Works Association’s (AWWA) 2020 “State of the Water Industry” report states that the top issue facing the water industry since 2016 is aging infrastructure, with the second being financing for improvements. The industry needs to find novel ways of extending asset life and reducing maintenance expenditures. While there are many different assets that comprise the water/wastewater industry, pipelines are a major component and are often neglected because they are typically buried. Reliability-Centered Maintenance (RCM) is a process used to determine the most effective maintenance strategy for an asset, with the ultimate goal being to establish the required function of the asset considering the required reliability and availability at the lowest cost. The RCM philosophy considers Preventive Maintenance, Predictive Maintenance, Condition Based Monitoring, Reactive Maintenance, and Proactive Maintenance techniques in an integrated manner to increase the probability an asset will perform its designed function throughout its design life with minimal maintenance. RCM requires maintenance decisions be based on maintenance requirements supported by sound technical and economic justification. However, one industry where principles of RCM are in its infancy is the water/wastewater industry. This paper provides a case example and numeric modeling for use in RCM analyses for developing maintenance strategies for large-diameter water pipelines, particularly prestressed concrete pipelines, and proposes an approach for determining the most effective and efficient maintenance activities for large-diameter prestressed concrete water pipelines. The case study discussed in this paper analyzed wire breaks over time to predict when certain thresholds would be reached. The intent of this study is to predict when a specified threshold will be reached. From the RCM, a threshold was set to begin planning, budgeting, and scheduling maintenance activities when 55% of the wires in a frame or two adjoining frames are distressed or when 65% of the wires in non-adjacent frames are distressed. The results from the numeric model predict the 55% threshold may be reached in August 2025 for the most distressed pipe segment.

Publisher

MDPI AG

Subject

Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry

Reference39 articles.

1. Allen, T., and Stevens, E. (2010, January 19–20). Classical RCM Method and Means. Proceedings of the RCM Manager’s Forum RCM 2010, Fort Lauderdale, FL, USA.

2. Allen, T. (2016). Leadership in Reliability—Central Arizona Project, Uptime Magazine.

3. Allen, T.U.S. (2001). Navy Analysis of Submarine Maintenance Data and the Development of Age and Reliability Profiles, American Society of Naval Engineers.

4. (2009). Evaluation Criteria for Reliability-Centered Maintenance RCM Processes (Standard No. JA1011).

5. (2011). A Guide to the Reliability-Centered Maintenance (RCM) Standard (Standard No. JA1012).

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3