1. A complex three-unit parallel system with preparation time for repair;Mwanga;S. Afr. J. Ind. Eng.,2009
2. Asymptotic confidence limits for the steady state availability of a two-unit parallel system with ‘preparation time’ for the repair facility;Yadavalli;Asia Pac. J. Oper. Res.,2002
3. Confidence limits for the steady state availability of a system with ‘rest period’ for the repair facility;Yadavalli;Electron. Model.,2002
4. An Intermittently Used System with Preparation Time for the Repair Facility;Yadavalli;Int. J. Reliab. Qual. Saf. Eng.,2004
5. Yadavalli, V.S.S., and Van Wyk, E. (2012, January 16–18). Two Unit Warm Standby Systems with ‘Preparation Time’ For the Repair. Proceedings of the CIE42, Cape Town, South Africa.