Abstract
The global production of broiler meat was forecasted to be 97.8 MT in 2019. The cost fluctuations create risks in production. In order to have an effective management system, process uncertainty must be taken into account. This approach considers the process as an interval with fuzzy numbers and, for managing the risks, it uses the variable α, a parameter determined by the manager in an interval between 0 and 1. Then two algorithms, namely the multi-objective imperialist competitive algorithm (MOICA) and multi-objective particle swarm optimization (MOPSO), were compared and applied. Since the process of production has many activities and each activity has possible options, the process does not have a unique solution. Therefore, the objective function and its assigned weights in terms of time, cost, and quality can be applied to select the best solution from those obtained. A vast amount of uncertainty can be observed, and effective management necessitates dealing with these uncertainty issues. The MOPSO algorithm showed better performance than the MOICA algorithm in this problem. Based on fuzzy logic and influenced by the uncertainty condition (α = 0), time, cost, and quality in the MOPSO and the MOICA algorithms were 1793.8 h, $260,571.7, and 46.66%, and 1792.5 h, $260,585.7, and 51.19%, respectively.
Subject
Plant Science,Agronomy and Crop Science,Food Science
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献