Abstract
Leakage is the most serious problem in reservoir operation, because heavy leakage influences reservoir impoundment efficiency and even leads to a complete loss of reservoir functions. Since its completion in 1982, Qionglin Reservoir has never been fully filled with water except in the spring of 1983 when there was heavy rain. The reservoir management unit suspected that its side slopes, bottom or dam might leak and carried out a number of leakage prevention and improvement works, but all of them failed to fulfill the impoundment function of the reservoir. Hence, this study attempts to find out the reasons why the reservoir cannot impound water. A series of tests and investigations are carried out in this study, including electrical resistivity tomography of dam, tracer test, geological drilling test, reservoir water level observation, investigation of reservoir catchment area and field investigation of dam. The test results and investigation results show that no leakage path and leakage are found. According to the analysis, there is no serious leakage of this reservoir. The main reason for the failure of impoundment is that massive improper development in the catchment area influences the runoff into the reservoir.
Subject
Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献