Abstract
Constructed wetlands (CWs) represent a green technology for digestate liquid fraction (DLF) treatment. However, previous research has warned about their performance when treating wastewater with high suspended solid and organic loads. In addition, the high NH4-N concentration typical of this wastewater can compromise vegetation establishment and activity. In view of this, a digestate pretreatment is needed. This study aimed to test the performance of filters filled with recovery materials, such as brick and refractory material, for DLF pretreatment. The effect on DLF physical (electrical conductivity, pH, dissolved oxygen, and temperature) and chemical (total nitrogen, ammonia–nitrogen, nitrate–nitrogen, total phosphorus, soluble phosphorus, and chemical oxygen demand) characteristics was monitored during eight weekly cycles. The effect of filtration on total nitrogen and ammonia–nitrogen removal began after about one month of loading, suggesting that an activation period is necessary for bacteria. For effective N removal, the presence of multiple digestate recirculations per day through the filters appears mandatory to guarantee the alternation of nitrification and denitrification conditions. For P removal, filling material particle size appeared to be more important than its composition. Unclear performances were observed considering chemical oxygen demand. Further studies on filling media and microbial community interactions, and the long-term efficiency of filters, are desirable.
Subject
Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献