Monitoring the living and production standards of resettlers due to hydraulic engineering is at the core of the evaluation of the effectiveness of resettlement and providing post-relocation support. In the past two decades, 0.196 million individuals were relocated outside of the reservoir area (out-resettlers) because of the construction of Three Gorges Dam. In 2019, large-scale tracking and monitoring of resettlers in 1371 households in 122 villages and 12 provinces was conducted by using the methods of stratified sampling, equidistant random sampling, and simple random sampling. The status of out-resettlers from the Three Gorges Reservoir area was compared with that of local residents in resettlement areas and nearby-resettlers based on the production–living–social security–social integration–satisfaction perspective. The results show that the living and production conditions of out-resettlers have significantly improved, and their income and consumption were positively correlated with the development level of the resettlement area. More than 90% of out-resettlers have adapted to local languages, cultural customs, and living habits. Out-resettlers have the highest satisfaction with infrastructure construction and public service facilities, at more than 90%, and the lowest satisfaction with the availability of arable land, at approximately 80%. This study can provide a reference for follow-up work on the Three Gorges Project.
Funder
Major Program of National Social Science Foundation of China
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献