Abstract
As the interconnection of renewable-energy-based distributed generations (DGs) to the distribution system increases, the local and temporary voltage and current problems, which are difficult to resolve with the existing operation method, are becoming serious. In this study, we propose a short-term operational method that can effectively resolve voltage and current violations caused by instantaneous output fluctuations of DGs in a system with a high hosting capacity of renewable energy sources. To achieve the objectives, a modified heuristic network reconfiguration method, and a method determining the maximum power output limit of individual DGs are proposed. We propose a cooperative method for controlling the power output fluctuations of renewable-energy-based DGs, which includes voltage control, network reconfiguration, and power curtailment. The proposed algorithm was verified through case studies by using a test system implemented in MATLAB environments. It can effectively resolve violations caused by DGs while minimizing the number of switching operations and power curtailment. The proposed method is an appropriate operation method to be applied to the real system as it can cope with the instantaneous output fluctuation of DGs, which was not dealt with in the existing operation method.
Funder
National Research Foundation of Korea
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献