As renewable energy (RE) costs decrease, private non-subsidized revenue sources, such as power purchase agreements (PPA), will increase in off-grid areas. This paper’s objective is to improve policymakers’ and utilities’ understanding of PPA’s role in mitigating private investors’ risks in off-grid areas to accelerate the energy transition. The paper built a PPA dataset for the largest off-grid area in the Philippines and developed novel and efficient techniques to evaluate the risk mitigation ability of a PPA. While oil-based technologies are expensive, they are low-capital-intensive, and the fuel, the bulk of the cost, is passed through to consumers and primarily funded by subsidies. In contrast, the most affordable energy source, RE, requires higher upfront capital investments, financed primarily with equity. Investors chose low-capital-intensive technologies (oil), rehabilitated power plants, and utilized old equipment, all investment decisions to mitigate residual PPA risks, i.e., distribution utilities’ low creditworthiness and capital recovery uncertainty. Presenting the investment as a PPA residual mitigation tool is one of the paper’s contributions to the literature. The distribution utility needs to reduce investors’ uncertainty by covering reasonable investors’ costs. Policymakers need to level the playing field between fossil fuels and RE by reducing subsidies and strengthening distribution utility creditworthiness.

Publisher

MDPI AG

Subject

Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous),Building and Construction

Reference60 articles.

1. Yescombe, E.R. (2013). Principles of Project Finance, Academic Press. [2nd ed.]. Available online: https://www.elsevier.com/books/principles-of-project-finance/yescombe/978-0-12-391058-5.

2. Pérez-Arriaga, I.J. (2013). Regulation of the Power Sector, Springer.

3. Overcoming barriers to wind project finance in Australia;Kann;Energy Policy,2009

4. IRENA (2016). Renewable Energy Market Analysis: Latin America, International Renewable Energy Agency. Available online: https://www.irena.org/publications/2016/Nov/Renewable-Energy-Market-Analysis-Latin-America.

5. Power Purchase Agreements and Financing Renewables: An Interdependency;Hundt;J. Struct. Financ.,2021

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3