Optimization of Equipment Operation in Power Systems Based on the Use in the Design of Frequency-Dependent Models

Author:

Monakov Yury1,Tarasov Alexander1,Ivannikov Alexander2ORCID,Murzintsev Alexander1,Shutenko Nikita1

Affiliation:

1. Department of Electrical Stations, Institute of Electrical Power Engineering, National Research University “Moscow Power Engineering Institute”, Krasnokazarmennaya St., 14, Building 1, 111250 Moscow, Russia

2. Department of Automated Control Systems, Institute of Computer Science, National University of Science and Technology MISIS, Leninsky Avenue 4, 119991 Moscow, Russia

Abstract

This article is devoted to the biggest problem of our time: the development of modern and highly efficient equipment for energy systems. We propose improved mathematical models for starting asynchronous motors in isolated power systems. The results of experiments carried out on a model of an isolated network are presented. Both frequency-dependent and frequency-independent models were used. A comparison of various models is given. The advantages of the frequency-dependent model, which provides a more accurate representation of the processes, are shown. The obtained results were discussed, and the possibility of their use for future research was assessed.

Publisher

MDPI AG

Subject

Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous),Building and Construction

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3