Impact of Stakeholders on Lean Six Sigma Project Costs and Outcomes during Implementation in an Air-Conditioner Manufacturing Industry

Author:

Sarwar Jawad,Khan Awais Ahmed,Khan Arshad,Hasnain Ali,Arafat Syed Muhammad,Ali Hafiz Umar,Uddin Ghulam Moeen,Sosnowski MarcinORCID,Krzywanski JaroslawORCID

Abstract

Modern manufacturing operations always aim toward sustainable production through sustainable operations. Lean Six Sigma manufacturing is one of the leading models to increase operational efficiency and productivity and reduce product manufacturing costs. The lean Six Sigma problem-solving methodology DMAIC has been one of the several techniques organizations use to improve their productivity and the quality of their product and services. This paper aims to apply Lean Six Sigma and DMAIC to enhance production capacity and reduce per-unit cost. Furthermore, this research work has been carried out to analyze the impact of stakeholders on Lean Six Sigma projects. The research follows the DMAIC methodology to investigate and analyze the root cause of the problems and give possible solutions for eliminating or reducing the issues. Particularly, fishbone and 5-Whys techniques were used to determine whether the two key processes, AC Outdoor unit testing with the help of reusable power cords and the un-efficient use of expanding machine, had an impact on low productivity and high per-unit cost. The analysis indicated the importance of stakeholders in lean Six Sigma projects. It has been found that key stakeholders can affect the result of lean Six Sigma projects, e.g., in the power cord modification project, a total of USD 7738 has been lost, while in expanding machine modification project total of USD 1339 has been lost due to ignorance of key stakeholders in both projects. This paper provides practical guidance to lean Six Sigma project team leaders to develop and define the key stakeholders at the beginning of the project and clearly identify the stakeholders’ responsibilities. Furthermore, the project leader must analyze and identify internal and external stakeholders b/c stakeholders may be internal or external. This paper provides theoretical guidance to lean Six Sigma project team leaders since ignoring stakeholders could give a misleading picture in terms of project cost, savings, and duration of the project. The project leader must consider key stakeholders’ costs and future strategies before starting the project. Although some project managers and experts have conducted analyses of stakeholders’ impact on projects, lean Six Sigma literature lacks solid examples of stakeholders’ impact on LSS project results. This study tries to address this research gap by analyzing the impact of key stakeholders on LSS projects.

Publisher

MDPI AG

Subject

Process Chemistry and Technology,Chemical Engineering (miscellaneous),Bioengineering

Reference77 articles.

1. Organizational productivity;Pritchard;Handbook of Industrial and Organizational Psychology,1992

2. Lean manufacturing: Literature review and research issues;Bhamu;Int. J. Oper. Prod. Manag.,2014

3. Lean manufacturing a vital tool to enhance productivity in manufacturing;Palange;Mater. Today Proc.,2021

4. Integration of value stream mapping with DMAIC for concurrent Lean-Kaizen: A case study on an air-conditioner assembly line;Guo;Adv. Mech. Eng.,2019

5. Lean implementation and its benefits to production industry;Singh;Int. J. Lean Six Sigma,2010

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3