Affiliation:
1. Logistics Engineering College, Shanghai Maritime University, Shanghai 201306, China
2. Institute of Logistics Science and Engineering, Shanghai Maritime University, Shanghai 201306, China
Abstract
In cloud manufacturing environments, the scheduling of multi-user manufacturing tasks often fails to consider the impact of service supply on resource allocation. This study addresses this gap by proposing a bi-objective multi-user multi-task scheduling model aimed at simultaneously minimising workload and maximising customer satisfaction. To accurately capture customer satisfaction, a novel comprehensive rating index is introduced, integrating the actual completion cost, time, and processing quality against customer expectations. Furthermore, vehicle constraints are incorporated into the model to accommodate potential delays in transport vehicle availability, thereby enhancing its alignment with real-world manufacturing settings. The proposed mathematical model is solved using an improved three-stage genetic algorithm, which integrates the k-means algorithm and a real-time sequence scheduling strategy to optimise solution quality. Validation against alternative algorithms across various case scales demonstrates the efficacy of the approach in providing practical scheduling solutions for real-case scenarios.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献