Abstract
The aim of the article is to analyze the method of determining the maintenance costs of buildings based on the method proposed in Polish legal regulations. The analysis of the sensitivity of the method shows that the assumed number of product use cycles during the calculation period has the greatest impact, while the adopted warranty period has the lowest impact. A multi-functional building combining housing, office, service and commercial was analyzed in order to obtain a broader picture of the model’s operation. The results of the analyses allow us to conclude that despite the higher price of materials, the most durable solutions, which are the most expensive to purchase, turn out to be the most advantageous in the entire life cycle of the building. The method proposed in Polish law regulations has certain limitations. In order to level them, it was proposed to extend the method by using NPV (Net Present Value) for calculations and extending the life cycle of the building to 80 years.
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development
Reference37 articles.
1. Eksploatacja Obiektów Budowlanych. Poradnik dla Właścicieli Zarządców Nieruchomości;Baryłka,2016
2. ISO 15686-5:2017-Buildings and Constructed Assets-Service Life Planning Part 5: Life cycle costinghttps://www.iso.org/standard/61148.html
3. EN 13306:2017-Maintenance-Maintenance Terminologyhttps://standards.iteh.ai/catalog/standards/cen/5af77559-ca38-483a-9310-823e8c517ee7/en-13306-2017
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献