A Quantitative Analysis of Decision-Making Risk Factors for Mega Infrastructure Projects in China

Author:

Wang Jianwang12,Luo Lan3ORCID,Sa Rina4,Zhou Wei4,Yu Zihan5

Affiliation:

1. School of Civil Engineering & Transportation, South China University of Technology, Guangzhou 510000, China

2. School of Civil Engineering and Architecture, Yan’an University, Yan’an 716000, China

3. School of Public Policy and Administration, Nanchang University, Nanchang 330031, China

4. School of Infrastructure Engineering, Nanchang University, Nanchang 330031, China

5. Faculty of Business, The Hong Kong Polytechnic University, Hong Kong 999077, China

Abstract

The “trillion-dollar era” of megaprojects has increased the demand for the scope of mega infrastructure. To address the requirement for high-quality “investment, construction, and operation” integration, the EPC and PPP models must be combined. The complexity of megaprojects has resulted in the complexity of project risk variables under the new model. However, few existing studies have undertaken in-depth studies on the risk of EPC + PPP megaprojects. The interplay and dynamic evolution of risk factors, in particular, have not been taken into account. This research intends to fill this gap by systematically identifying and modeling the risk variables associated with the adoption of the EPC + PPP model for mega infrastructure projects. In this study, the Bayesian network is used to detect decision-making risk variables for large infrastructure projects in China. The findings indicate that (i) 22 influencing factors of megaproject decision making are identified, including organizational decision making, PPP investment and financing, EPC construction, operations management, and policy and law. (ii) Considering the real project decision-making process, a model based on a dynamic Bayesian network is built, and associated governance techniques and early warning protection mechanisms are designed for the decision-making process. (iii) Using the Yiwu Mall Avenue project as an example, the Bayesian simulation model of decision-making risks is applied to a typical case to validate its feasibility and correctness. These findings have significant theoretical and practical implications for research on the identification and governance of decision-making risks in megaprojects using the EPC + PPP model in China.

Funder

National Natural Science Foundation of China

Jiangxi Provincial Social Science Foundation

Jiangxi Provincial Natural Science Foundation

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction

Reference126 articles.

1. (2023, June 09). Global Infrastructure Hub. Available online: https://www.gihub.org/resources/publications/global-infrastructure-investment-index/.

2. Creating long-term social value on major infrastructure projects: A case study;Freelove;Eng. Sustain.,2022

3. Exploring the patterns of convergence and divergence in the development of major infrastructure projects;Floricel;Int. J. Proj. Manag.,2022

4. Development of infrastructure projects sustainability assessment model;Hosny;Environ. Dev. Sustain.,2021

5. A study on the bilateral moral hazard of PPP projects in China;Guixia;Ind. Econ. Rev.,2022

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3