An Investigation of a Floor Treatment Plan for In-Pit Dumps with an Underlying Weak Layer

Author:

Jia Lan1,Fang Linhao1,Gao Shisong1,Jiang Juyu1,Xia Dong2

Affiliation:

1. College of Mining, Liaoning Technical University, Fuxin 123000, China

2. Inner Mongolia Pingxi Baiyinhua Coal Co., Ltd., Xilinhot 026000, China

Abstract

To effectively manage the stability of in-pit dumps with an underlying weak layer, a new plan for the treatment of a staged floor during the life of a mine was proposed in this study. Based on direct shear test results, the shear properties of contact surfaces between the weak layer, dumped spoil, and mudstone were determined. Taking the Baiyinhua No.1 Open-pit Mine as an example, a direct shear test of the contact surface between the spoil and the mudstone determined its cohesion to be 25.78 kPa, and the internal friction angle was 17.58°. The cohesion of the contact surface between the spoil and the weak layer was 7.50 kPa, and the internal friction angle was 9.72°. Different floor treatment rates were subsequently determined based on discontinuous structural surface and limit equilibrium theories. The in-pit dump plan was divided into stages based on a 10-year mine plan; a “safety reserve coefficient” was used as the conditional factor to calculate the minimum floor treatment rate. The results of a numerical simulation analysis of the slope stability of the untreated and treated inner dumps showed good agreement with results obtained by the limit equilibrium method. The position and shape of the sliding surface were also found to be similar, indicating the validity of the established numerical simulation model and the reliability of the calculated results. Based on field application and economic effect analysis, it was found that this proposed method can minimize the floor treatment rate effectively while maintaining a sufficient factor of safety. The direct economic benefit of this method was approximately 1,694,259 dollars at the Baiyinhua No.1 Coal Mine. This method is of great significance to safe and efficient production, and can be widely applied.

Funder

National Natural Science Foundation of China

Silk Road 1+1 Research Cooperation Project of Ministry of Education

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction

Reference36 articles.

1. Achievement and developing trend of open-pit mining in China;Tian;Open-Pit Min. Technol.,2019

2. Development status and tendency of world open-pit coal mine;Zhang;China Coal,2014

3. Li, G. (2020). Study on Mechanical Effect and Application of Supporting and Retaining Coal Pillar in Inner Dump. [Ph.D. Thesis, Liaoning Technical University].

4. Study on significance of influencing factors of waste dump stability;Zhang;China J. Saf. Sci.,2021

5. Research on control measures for deformation and failure of dump with weak basement;Cao;J. Saf. Sci. Technol.,2015

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3