Author:
Liao Shengli,Zhao Hongye,Li Gang,Liu Benxi
Abstract
Short-term load dispatching (STLD) for a hydropower plant with multiple turbines in one tunnel (HPMTT) refers to determining when to startup or shutdown the units of different tunnels and scheduling the online units of each tunnel to obtain optimal load dispatch while simultaneously meeting the hydraulic and electric system constraints. Modeling and solving the STLD for a HPMTT is extremely difficult due to mutual interference between units and complications of the hydraulic head calculation. Considering the complexity of the hydraulic connections between multiple power units in one tunnel, a two-phase decomposition approach for subproblems of unit-commit (UC) and optimal load dispatch (OLD) is described and a two-stage model (TSM) is adopted in this paper. In the first stage, an on/off model for the units considering duration constraints is established, and the on/off status of the units and tunnels is determined using a heuristic searching method and a progressive optimal algorithm. In the second stage, a load distribution model is established and solved using dynamic programming for optimal load distribution under the premise of the on/off status of the tunnel and units in the first stage. The proposed method is verified using the load distribution problem for the Tianshengqiao-II reservoir (TSQII) in dry season under different typical load rates. The results meet the practical operation requirements and demonstrate the practicability of the proposed method.
Funder
National Natural Science Foundation of China
Liaoning province Natural Science Foundation of China
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献