Numerical Simulation Study on the Influence of Construction Load on the Cutoff Wall in Reservoir Engineering

Author:

Sun Yongshuai1ORCID,Lei Anping2,Yang Ke3,Wang Guihe4

Affiliation:

1. College of Water Resources & Civil Engineering, China Agricultural University, Beijing 100083, China

2. China Highway Engineering Consultants Corporation, Beijing 100089, China

3. Land and Resources Exploration Center, Hebei Bureau of Geology and Mineral Resources Exploration, Shijiazhuang 050081, China

4. School of Engineering and Technology, China University of Geosciences, Beijing 100083, China

Abstract

Relying on the Beijing-Shijiazhuang Expressway widening project near the impervious wall of a reservoir, this paper uses FLAC3D two-dimensional and three-dimensional numerical simulation methods to establish the whole process model of the impervious wall of the reservoir affected by the construction load of the high-way reconstruction section. The stress and strain state of the cut-off wall in the high-way reconstruction section and the nearby reservoir is simulated in detail, the overall deformation of the cut-off wall in the reservoir is directly reflected, and the interaction and differential deformation between the wall structures are reflected. The safety and stability of the cutoff wall of the reservoir affected by the construction load are evaluated so that various advanced mechanical behaviors of the cutoff wall can be predicted. Research results show that the horizontal displacement value of the wall gradually increases from bottom to top, and the maximum value appears at the top of the wall. The horizontal displacement value of the 1–3 walls is relatively large, with the maximum value of 22.368 mm, and the horizontal displacement value of the 4–10 walls shows little difference. This is on account of the gravity of the backfill, the strata in the whole project area having settled, and the settlement at the bottom of the cut-off wall being 2.542 mm. At the root of the rigid cut-off wall, the compressive stress concentration occurs, with the maximum value between 1.75 MPa and 2.15 MPa. Due to the size of the structure, the maximum tensile stress of 0.237 MPa appears in the local area near the guide wall of the rigid cut-off wall, which will not endanger the rigid cut-off wall because of its small value. The maximum stress in the rigid impervious wall and the plastic impervious wall are 1.90–2.15 MPa and 1.00–1.12 MPa, respectively. Apart from the small tensile stress at the connecting guide wall between the rigid cut-off wall and the plastic concrete cut-off wall, the cut-off wall is under pressure, especially the plastic cut-off wall. Combined with the analysis of the stress state of the wall, it can be determined that the anti-seepage wall (rigid cut-off wall and plastic concrete cut-off wall) is stable and safe during the construction period.

Publisher

MDPI AG

Subject

Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry

Reference48 articles.

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3