Affiliation:
1. Department of Electromechanical Engineering, University of Beira Interior, Rua Marquês de D’Ávila e Bolama, 6201-001 Covilhã, Portugal
2. C-MAST—Centre for Mechanical and Aerospace Science and Technologies, 6201-001 Covilhã, Portugal
Abstract
The current market is highly competitive, and customers are increasingly demanding. In this context, organizations need to adopt tools that enhance process efficiency to ensure competitiveness. This report aims to implement Lean tools, specifically Value Stream Mapping (VSM) and complementary tools, to optimize the production process in the metal treatment industry. A case study was conducted, beginning with a brief sector and process recognition, followed by an analysis of production stages using VSM. Value-added activities, non-value-added activities, and waste were identified. The current VSM revealed a Lead Time (LT) of approximately 336 h (14 days), value-added activities (VA) of 21 h, and a process cycle efficiency (PCE) of 6.29%. Improvement actions were proposed to reduce waste and increase competitiveness. After implementation, the LT decreased to approximately 318 h (13 days), VA increased to 23 h, and process efficiency improved to 7.15%. Despite the limitations of VSM in discontinuous flows, its use increased process efficiency, demonstrating its applicability in complex industrial contexts.
Funder
Fundação para a Ciência e Tecnologia
Reference41 articles.
1. Valencia, E., Garcia, Y., Santivanez, G., and Castaneda, E. (2022, January 25–27). Production Management Model to Reduce Cycle Times Using Lean Manufacturing in a Company in the Metalworking Sector. Proceedings of the 2022 8th International Conference on Information Management (ICIM 2022), London, UK.
2. Ohno, T. (1997). O Sistema Toyota de Produção-Além da Produção em Larga Escala, Bookman. [1st ed.]. Available online: http://books.google.com.br/books?id=dg4_3tlM8EYC.
3. Continuous improvement through ‘Lean Tools’: An application in a mechanical company;Oliveira;Procedia Manuf.,2017
4. De-La-Cruz-Arcela, F., Martinez-Castillo, J., Altamirano-Flores, E., and Alvarez-Merino, J. (2019, January 15–18). Application of Lean Manufacturing Tools to Reduce Downtime in a Small Metalworking Facility. Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, Macao, China.
5. Value stream mapping to reduce the lead-time of a product development process;Tyagi;Int. J. Prod. Econ.,2015