Author:
Liu Chong,Qian Kai,Li Yuguang
Abstract
Ensuring the stable operation of urban wastewater treatment plants (WWTPs) and achieving energy conservation and emission reduction have become serious problems with the improvement of national requirements for WWTP effluent. Based on a wastewater quality analysis, identification of the contaminant removal, and a simulation and optimization of the wastewater treatment process, a practical engineering diagnosis method for the cyclic activated sludge technology process of WWTPs in China and an optimal control scheme are proposed in this study. Results showed that exceeding the standard of effluent nitrogen and phosphorus due to unreasonable process cycle setting and insufficient influent carbon source is dangerous. The total nitrogen removal rate increased by 9.5% and steadily increased to 67% when agitation was added to the first 40 min of the cycle. Additionally, the total phosphorus (TP) was reduced to 0.27 mg/L after replacing the phosphorus removal agent polyferric sulfate with polyaluminum iron. The corresponding increase in the TP removal rate to 97% resulted in a reduction in the treatment cost by 0.008 CNY/t.
Funder
Wuxi Innovation and Entrepreneurship Program for Science and Technology
Subject
Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献