Structural Parameter Optimization for Large Spacing Sublevel Caving in Chengchao Iron Mine

Author:

Tan YuyeORCID,Guo MochuanORCID,Hao Yimin,Zhang Chi,Song Weidong

Abstract

Non-pillar sublevel caving is beginning to use large structural parameters in China. Appropriate structural parameters can effectively control the loss and dilution of stope and improve ore drawing efficiency. In this study, taking Chengchao Iron Mine as the engineering background, a theoretical calculation, a numerical simulation, and physical similarity experiments were combined to optimize sublevel height, production drift spacing, and drawing space. The optimal structural parameter range, based on the ellipsoid ore drawing theory, was obtained as a theoretical reference for subsequent studies. A “two-step” strategy was used, in which PFC2D software (Itasca Consulting Group, Minneapolis, MN, USA) was used to numerically simulate 20 groups of different sublevel heights and production drift spacing parameters were used to determine the appropriate sublevel height and production drift spacing for the project. Subsequently, the optimization of the ore drawing space was studied using PFC3D (Itasca Consulting Group, Minneapolis, MN, USA) particle unit software, numerical simulation analysis, and similar physical experiments. The results showed that safe and efficient mining can be achieved when the structural parameters of the stope are 17.5 m sublevel height, 20 m production drift spacing, and 6 m drawing space. The findings of this study can further the goal of green and efficient mining, and provide a theoretical reference for the popularization and application of pillarless sublevel caving with large structural parameters at home and abroad. It is an effective measure for the green mining of caving mines.

Publisher

MDPI AG

Subject

General Materials Science,Metals and Alloys

Reference33 articles.

1. Optimization of rate of advance during ore breaking of caving method based on multi-method joint application;An;Chin. J. Rock Mech. Eng.,2013

2. Basis of Ore-drawing without Dilution for Sublevel Caving Method (First Part);Liu;Metal Mine,1995

3. Optimization of breaking interval in non-pillar sublevel caving mining;Wang;J. Cent. South Univ.,2014

4. Transition sublevel drawing optimization for large structural parameters of pillarless sublevel caving method;Kaicheng;China Min. Mag.,2020

5. The development direction of no-pillar sublevel caving mining in China;Sun;J. Inst. Technol.,2007

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3