Abstract
Roughly two billion people live in areas that regularly suffer from conflict, violence, and instability. Infrastructure development in those areas is very difficult to implement and fund. As an example, electrification systems face major challenges such as ensuring the security of the workforce or reliability of power supply. This paper presents electrification results from an explorative methodology, where the costs and risks of conflict are explicitly considered in a geo-spatial, least cost electrification model. Discount factor and risk premium adjustments are introduced per technology and location in order to examine changes in electrification outlooks in Afghanistan. Findings indicate that the cost optimal electrification mix is very sensitive to the local context; yet, certain patterns emerge. Urban populations create a strong consumer base for grid electricity, in some cases even under higher risk. For peri-urban and rural areas, electrification options are more sensitive to conflict-induced risk variation. In this paper, we identify these inflection points, quantify key decision parameters, and present policy recommendations for universal electrification of Afghanistan by 2030.
Funder
World Bank Group
Department for International Development, UK Government
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献