Abstract
(1) In recent years, with China’s increasing investment in the transportation industry, the construction of highways and bridges has flourished, bringing great convenience to people’s lives. At the same time, there are many uncertain factors in the process of bridge construction, being prone to construction risks. In order to meet the requirements of sustainable development, it is necessary to accurately evaluate the safety risk level of bridge construction. Therefore, it is necessary to establish a new scientific safety risk evaluation system for highway bridge construction. (2) Methods. Based on the relevant standards and specifications, this paper establishes a highway bridge construction safety risk evaluation index system, and then uses the cloud entropy weight method to objectively weight each risk index, using cloud model theory to conduct a risk assessment, and through the cloud model images directly determine the overall risk level of bridge construction, and the level of risk indicators. (3) Results. Applying this method to the construction safety risk assessment of a particular bridge, the overall construction risk level of the bridge is obtained as “level 4”, and the risk levels of the four first-level indicators are also all “level 4”. (4) Conclusions. The cloud entropy weight method proposed in this paper and the traditional AHP-Extenics method are applied to a bridge construction safety risk evaluation, and the evaluation results obtained are consistent. However, this paper uses the cloud model to improve the entropy weight method in order to calculate the weights, which fully reflects the objectivity of the assignment. The cloud model is used for evaluation, and the risk level of indicators can be determined visually with images.
Subject
Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science
Reference43 articles.
1. On the efficient risk assessment of bridge structures;O’Reilly;Proceedings of the 7th ECCOMAS Thematic Conference on Computational Methods in Structural Dynamics and Earthquake Engineering,2019
2. Probabilistic risk assessment for the construction phases of a bridge construction based on finite element analysis
3. IoT-and NDT-based bridge risk assessment and identification;Agarwal,2018
4. Research on Safety Risk Assessment and Control of Bridge Construction in Mountainous Areas;Wang,2018
5. Investigating risk of bridge construction project: exploring Suramadu strait-crossing cable-stayed bridge in Indonesia
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献