Abstract
A CFBC (Circulating Fluidized Bed Combustor) boiler for combusted SRF (Solid Refused Fuel) is designed for solid waste combustion and power generation. The boiler consumes about 200 tons/day of SRF and generates 60 ton/h of steam or 10 MWe in electricity. The boiler is designed to burn pelletized waste fuel made of municipal solid waste collected from a town with a population of 400,000. Heat and mass balance calculations over the combustor and at each boiler section were performed and compared between the designed and measured data to analyze the boiler’s performance. After-combustion, the most significant phenomenon in low-density waste-derived fuel combustion in a CFBC boiler was monitored. The heat and mass balance were the most appropriate tools to analyze the boiler performance. The flow rate of spray water at the de-superheater was a reliable indicator to quantify the after-combustion. The design modification of the boiler unit for after-combustion control in the existing boiler was based on the quantification of spray water. The load distribution of the de-superheater decreases from 1.76% to 0.87% in 89% MCR before the installation of the evaporator and 82* % MCR load distribution of each boiler part after installation. The result was effective for the control of after-combustion in the existing boiler.
Funder
National Research Council of Science & Technology
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous),Building and Construction
Reference30 articles.
1. Fluidized bed combustion of refuse-derived fuel in presence of protective coal ash
2. Japanese RDF-Fired Power Generation System and Fundamental Research on RDF Combustion;Narukawa,1997
3. Combined Heat and Power from Municipal Solid Waste: Current Status and Issues in South Korea
4. Amendment of the Enforcement Decree of the Waste Control Act, ME Decree;Korea Ministry of Environment,2007
5. Amendment of the Enforcement Decree of the Clean Air Conservation Act, ME Act;Korea Ministry of Environment,2007
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献