Abstract
Building Information Modeling (BIM) has been increasingly used in coordinating the different mechanical, electrical, and plumbing (MEP) services in the construction industries. As the construction industries are slowly adapting to BIM, the use of 2D software may become obsolete in the future as MEP services are technically more complicated to coordinate, due to respective services’ codes of practice to follow and limit ceiling height. The 3D MEP designs are easy to visualize before installing the respective MEP services on the construction site to prevent delay in the construction process. The aid of current advanced technology has brought BIM to the next level to reduce manual work through automation. Combining both innovative technology and suitable management methods not only improves the workflow in design coordination, but also decreases conflict on the construction site and lowers labor costs. Therefore, this paper tries to explore possible advance technology in BIM and management strategies that could help MEP services to increase productivity, accuracy, and efficiency with a lower cost of finalizing the design of the building. This will assist the contractors to complete construction works before the targeted schedule and meet the client’s expectations.
Funder
SUTD-ZJU IDEA Visiting Professor Grant
Subject
Electrical and Electronic Engineering,Biochemistry,Instrumentation,Atomic and Molecular Physics, and Optics,Analytical Chemistry
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献