Abstract
This paper studies a single-machine problem with resource allocation (RA) and deteriorating effect (DE). Under group technology (GT) and limited resource availability, our goal is to determine the schedules of groups and jobs within each group such that the total completion time is minimized. For three special cases, polynomial time algorithms are given. For a general case, a heuristic, a tabu search algorithm, and an exact (i.e., branch-and-bound) algorithm are proposed to solve this problem.
Subject
General Mathematics,Engineering (miscellaneous),Computer Science (miscellaneous)
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献